Initial Rack Installation
Manufactured rack mount bars to hold the two power supplies and the battery.
Preliminary Control Box Internals
The inside of the control box is pictured. There are 3 power supplies (24V, 15V, 5V), 4 Relays, a LabJack for data aquisition, and a high current switch for the entire instrument.
Internals with Zip-Ties
Panel mount view. Shows 6 DB15 ports for the Mass Flow Controllers (MFCs) and Mass Flow Meters (MFMs). The DAQ I/O are standard BNC 5V Digitall outputs. The LabJack communicates over ethernet, and a DB9 port houses the relay connections.
Test setup on top of instrument.
Final closed assembly rear view with power interrupt cables.
Final closed assembly front view.
Post installation instrument view #1.
Post installation instrument view #2.